Design projects carried out by the company:

 

Project name: Moudao National Defense Highway

Duration of assignment (months): 6 months

Description of Project:

Moudao National Defense Highway is a grade III highway of two lanes and its width of pavement is 6.5 meters. The total length of the line is 121 kilometres.  There are 4 large and medium sized bridges, 32 small bridges and culverts for the whole line, and earth and stone work of subgrade for the project is 2.90 million cubic meters.

 

Project Name: 2012 County and Township Modified Highway Project of Rongcheng

Duration of assignment (months): 9 months

Description of Project:

2012 County and Township Modified Highway Project of Rongcheng is a grade II highway of four lanes and width of pavement is 16 meters. Its total length is 102.4 kilometers and its two-way length is 204.8 kilometers. There are 6 large and medium sized bridges, 26 small bridges and 89 culverts for the whole line, and earth and stone work of subgrade is 1.30 million cubic meters.

 

Project Name: Rongcheng Section of National Highway from Ningjin of Rongcheng City to Xujia of Lushan City

Duration of assignment (months): 4 months

Description of Project:

Rongcheng Section of National Highway from Ningjin of Rongcheng City to Xujia of Lushan City is a grade II highway of two lanes, and its width of pavement is 9 meters. Its total length is 121.996 kilometers. There are 20 large and medium sized bridges, 60 small bridges, 82 culverts for the whole line, and earth and stone work of subgrade for the project is 5.0553million m3.

 

Project Name: Huangnigou-Binghailu National Defense Highway of Wendeng

Duration of assignment (months): 3 months

Description of Project:

Huangnigou-Binghailu National Defense Highway of Wendeng is a grade II highway of two lanes, width of pavement is 7.5 meters, and its total length is 129.81 kilometers. There are 5 large-sized bridge, 5 medium-sized bridges, 60 small bridges and 100 culverts for the whole line, and earth and stone work of subgrade for the whole line is 410,500 m3.

 

Project Name: Yahou-Haiyang Section of No.309 National Highway

Duration of assignment (months): 5 months

Description of Project:

Yahou-Haiyang Section of No.309 National Highway is a grade II highway of two lanes, width of pavement is 10.5 meters. The total length of the line is 130 kilometres. There are 12 large and medium sized bridges, 45 small bridges, 152 culverts and 4 tunnels; exploded stone work is nearly 1.20million m3, max. Excavated work is 44 meters and max filling work is 23.8 meters for the whole line.

 

Project Name: Dagushan-Nanhuang Section of No.202 Provincial Highway

Duration of assignment (months): 5 months

Description of Project:

Dagushan-Nanhuang Section of No.202 Provincial Highway is a grade II highway of two lanes, width of pavement is 12 meters, and its total length is 105 kilometers. There are 15 large-sized and medium-sized bridges, 168 small bridges and culverts for the whole line, and earth and stone work of subgrade for the whole line is 2.25million m3.

 

Project Name: Coastal Tourist Landscape Highway

Duration of assignment (months): 6 months

Description of Project:

Coastal Tourist Landscape Highway is a grade II highway of four lanes, width of pavement is 18 meters, and its total length is 124 kilometers. There are 5 large-sized bridges, 10 medium-sized bridges, 60 small bridges and 160 culverts for the whole line, and earth and stone work of subgrade for the whole line is 2.03million m3.

 

Project Name: Modified Project of Wendeng Section of Coastal Highway of Weihai

Duration of assignment (months): 5 months

Description of Project:

Modified project of Wendeng Section of Coastal Highway of Weihai is a grade II highway of two lanes, width of pavement is 12 meters, and its total length is 135.8 kilometers. There are 1 ultra-large bridge, 16 large-sized and medium-sized bridges, 63 small bridges and 205 culverts for the whole line, and earth and stone work of subgrade for the whole line is 3.5408 million m3.

 

Project Name: Jinyin Avenue, Lushan, Weihai

Duration of assignment (months): 10 months

Description of Project:

Jinyin Avenue, Lushan, Weihai is a road of four lanes, width of pavement is 18 meters, and its total length is 56 kilometers, and length of its two-way line is 112 kilometers.  There are 12 large-sized and medium-sized bridges, 32 small bridges and 170 culverts for the whole line, and earth and stone work of subgrade for the whole line is 2.56328 million m3.

 

Project Name: Wujiacun-Jinjiadianzi Section of Shidao Management District of S305 Shize Line

Duration of assignment (months): 7 months

Description of Project:

Wujiacun-Jinjiadianzi Section of Shidao Management District of S305 Shize Line is a grade II highway of four lanes, width of pavement is 16 meters, its total length is 57.96 kilometers, and length of its two-way line is 115.92 kilometers. There are 8 large-sized and medium-sized bridges, 32 small bridges and 62 culverts that are repaired and exploited for the whole line, and earth and stone work of subgrade for the whole line is 16.538 million m3.

 

Project name: Jinan Licheng Gangjiu Road (Jilai Expressway port to Taohualing Section) Intermediate repair project

 

Party A: Jinan Licheng government, Ganggou street office

 

Party B: Shandong Great Supervision and Consultation Co., Ltd

 

Signing location: Jinan Licheng District

 

Signing date: May 10, 2017


Previous:Design process and outputs2020-07-14
Next:Design effect pictures2020-07-14

Shandong Great Transportation Technology Co., Ltd.

Phone:0631-5285209

Mailbox:bgs@sdgrtjk.cn

Add:No.2 Wenquan Mingzhu, Huancui District, Weihai City, Shandong Province

Scan wechat

Copyright © Shandong Great Transportation Technology Co., Ltd. All rights reserved record number:鲁ICP备2023018311号-1 Disclaimers